My work has gone to reduced hours on 12 hour shifts, meaning i work 2 or 3 days a week. I've decided to build a shed so that i can clear stuff out the garage to actually allow me to work on the kit car, and hopefully get it back on the road. Having laid a patio and enjoying the extra space in the back garden area after demolishing the old shed, I've decided to put its replacement in the 6 foot wide gap down the side of the house, whilst retaining access to the front. The result will hopefully be a 16' x 3' shed.
Monday was design, Tuesday was excavation and backfill with old rubble i hadn't taken to the tip / hardcore and wednesday was laying the slabs. I'm not trying to do it full time, enjoying time with Thomas is also a priority.